Vestigo Version 5.5 Release
Vestigo and Vestigo Verify Version 5.5 Release Notes
Released November 16, 2023
Project Management
The 5.5 Vestigo Release includes project management features designed to save time and increase visibility by allowing you to track protocol processes within Vestigo that are currently being managed outside of Vestigo. It will also include an update to the protocol close-out process to ensure clarity and prevent errors.
|
Feature |
Description |
|
Protocol Budgets |
Create and download Vestigo Protocol Budgets for potential protocols. Saved budgets can be used as the template for the protocol's billing fees. Build a budget with Vestigo Billing Templates or manually select fees, incorporate fee descriptions, dates for the negotiated budget, and specific study details. |
|
Protocol Checklist |
Create Vestigo Protocol Checklists for various activities like study start up, audit preparation, and close out. Build checklists or use checklist templates to assign tasks to users, attach documents, and apply due dates. Users can document completion date and details for assigned tasks with a new user specific alert option. |
|
Protocol Close-Out Workflow |
An updated workflow for closing a protocol to guide users through a detailed process. Use a pre-built Protocol Vestigo Close Out Checklist to ensure completeness, capture close out fees, review, and process remaining inventory on hand, in quarantine and returns, unenroll patients, and manage billing accounts. |
Verifications and Quality Control
The 5.5 release addresses the growing need for documentation of verifications for Shipment Receipts, Patient Returns and Quarantined inventory. The following optional settings will be available to the drug and order builds of a protocol when reminders and verifications are required.
|
Setting |
Description |
Alert Associated |
|
Patient Drug Return Requirements for Prescriptions |
Set Order Builds to require a prescription return within a set number of days, set to navigate to the Prescription Return screen to document specific disposition of Return or Destruction. The Download Protocol Orders report will assist sites in identifying affected orders. Specify if a patient return must be completed on or after dispensing. |
Outstanding patient returns that are past the expected date with an option to override. |
|
Requiring Drug Return/Quarantine Verifications |
Specify on a drug build to require another user to verify prescription returns or inventory quarantines, with an option to override, before recording destruction or return to sponsor.
|
New alert of returns and quarantined inventory awaiting verification. |
|
Requiring Shipment Receipt Verifications |
Specify at the facility level, protocol level, and/or drug level if a drug Shipment Receipt requires additional verification before being completed. Allow self-verification after a pre-determined time limit and overrides.
|
New alert of shipment receipts awaiting verification |
Other Vestigo and Vestigo Verify Version 5.5 Updates
Please review the following additional updates within version 5.5 release.
|
| Report Updates |
|
Please contact support@mccreadiegroup.com if you have any questions or concerns.